There is a conversation that happens on commercial and municipal waterfront projects that most dock companies never get to have. The project manager asks for a PE stamp. The building official requires engineered drawings. And one by one the regional dock installers get eliminated — not because their product is bad but because they cannot meet the engineering requirement. Sebago Dock & Lift stays in that conversation.

A PE stamp means a licensed engineer has reviewed, designed, and taken professional responsibility for the structural integrity of the system. For commercial projects it means: your project can be permitted, your liability is protected, your project meets code, and your project can be federally funded. Without a PE stamp your project does not move forward.

FEMA Project — Sebago Dock & Lift was awarded a FEMA-related waterfront project on the strength of our PE stamp. Competing dock companies were eliminated. We won.
Municipal Contract — We were awarded a separate municipal waterfront contract on PE-stamped engineering capability. Municipal projects require documentation, certified drawings, and engineering oversight that most regional dock companies cannot provide. We delivered all of it.

ADA-compliant waterfront access requires specific slope ratios, handrail specifications, surface requirements, landing dimensions, and turning radius clearances — all documented and certified. Sebago Dock & Lift designs and installs ADA-compliant aluminum ramp systems that meet federal accessibility requirements. Our PE stamp covers the engineering certification required for ADA compliance documentation.

Municipal Marinas and Boat Launches — Commercial Marina Developments — Waterfront Parks and Recreation — Resort and Hotel Waterfront — Waterfront HOA and Condominium Facilities — Federal and State Agency Projects
Project Consultation — detailed scope, site conditions, permit requirements, engineering needs, ADA, budget, timeline
Site Assessment — water depth, bottom conditions, seasonal fluctuation, environmental constraints
Engineering and Design — PE-stamped drawings, structural calculations, permit submission package
Permitting Support — documentation package, agency coordination throughout ME, NH, MA
Manufacturing — every component built at Naples ME factory using proprietary aluminum profiles
Installation — on schedule, to specification, with project documentation and as-built drawings
© 2026 Sebago Dock & Lift. All Rights Reserved. | Site Credits